The narthex continues to improve. No, really though. Look at what an update to the ceilings does, with a smooth finish and bright coat of paint. Under the plastic are almost all the sanctuary pews, and on top of it are several acoustical panels from the sanctuary.

New exterior doors at the main entry are now installed! There will be a second set of doors creating a vestibule where the choir loft elevator is going in. The brand new shaft for the choir loft elevator is ready for its installation.

The coat room area is also transformed. A walk-in coat area has been created, which is a huge change from what it used to be.