SNEAK PEEK TIME!  The new carpet is installed, along with the replacement tile at the altar, cove lighting, and some paint! Mid-morning light provides lovely pattern and color to the transept wall and pew area.

The choir loft sees continued work. It was not possible to get meaningful photos from the sanctuary, or visit the loft, this day. It is a smaller space with lots of workers doing lots of things with lots of tools.

The stained glass panels near the choir loft elevator were reinstalled weeks ago and carefully protected in order to finish work on the shaft. The remaining panels on the west side will be reinstalled toward the end of the project.