Work continues on utilities in Acker Hall. Lines for the new accessible restrooms are roughed in. As perspective, here are Before and Current pictures of the stage.

Remember the old bank of light switches at the top of the ramp? Those are being addressed. New ventilation ductwork is in, along with conduit for lighting.